Gallup Hill School, Ledyard, CT
scroll down for details
39,591 SF Addition and 40,497 SF of Renovations
$28 Million
Completed: 2018
The addition creates a new bus loop and separate parent’s vehicular traffic pattern, including a Pre-K parent drop off on the existing 14.6-acre site
The renovated school and the school addition “re-stacks” the grades to allow for a Prek to 1st grade wing and all new classrooms through the 5th grade, supported by new music art, media center with new cafeteria and kitchen
Gymnasium was renovated to allow for physical education and assembly with stage/platform
All new electric, new heating, ventilation, and air conditioning throughout the school
New technology infrastructure to support education, and low voltage systems throughout in a challenging 1950s school building