38,994 sf Additions and 51,710 sf of Renovations
$35 Million
Completed: 2019
The new 6th to 8th grade MS is hierarchical from 6th grade on 1st floor rising to the 8th grade on 3rd floor with new educational science classrooms
New classroom wings are supported by a new auditorium, music, choral, art classrooms as well as “maker”/shop and technology classroom adjacent the new media center, new cafeteria, and kitchen
Gym was renovated with all new lockers rooms
An emergency generator permits the Town to use the school as an emergency shelter
All new electric, new heating, ventilation, and air conditioning through the school; low voltage systems throughout
New technology infrastructure to support education